This has been a big week for us! The carpet is coming right along, the new cabinets are being installed, and many fixtures have arrived.
These first two pictures show the carpet for the atrium. It's arrived and in the process of being installed.
These photos show how the carpet is progressing in the JR and YA areas. Most of it has been laid, with the exception of that strip on the far side of the photo.
This next photo shows our new drinking fountains. They're between the two public restrooms, down the hallway to the Community Room.
These next photos show the kitchen cabinets. We're going to have a nice kitchen off the Community Room! As you can see, we're just waiting for the counter tops.
Here is a photo of one of our staff bathrooms. All the fixtures have arrived!
Here's a first look at the entryway to the new building. There's two sets of doors, with a space in between. Here will be the inside book drop, as well as the community bulletin board.
And, finally, here is the new view of the library as you enter the front doors. The circulation desk is to the left, and the YA area is straight ahead. You can see the light from the atrium streaming into the lobby area.