
The setting for the actual groundbreaking was the little strip of lawn on the east side of the distribution center. Here's what it looked like that morning, nothing but a patch of tall weeds. The sod was cut out earlier in the summer. About an hour before the ceremony was to take place, the contractor, Bateman-Hall, cleared the space with a backhoe.

And here it is all ready for the ceremony.
This is the north side of the old building before we decorated for the groundbreaking.
Now the stage is set...
No comments:
Post a Comment