Showing posts with label clerestory. Show all posts
Showing posts with label clerestory. Show all posts

Monday, August 23, 2010

Drywall is Up in the New Remodel

The remodeling is starting to make the old library look like the new addition.  It looks like all the drywall is now up and waiting for the next phase of construction.

This first photo shows our old front entrance.  You can see the monument to the library that was taken in the Teton Dam Flood.  I believe our flagpole will be moved to be closer to the monument.  This area will no longer be an entrance, but there will be a door for an emergency exit.

This next photo was taken from the back of old General Collections.  We're looking west to where the old staff area and circulation desk used to be.  The wall you see in the back will be to the public restrooms and the janitor's closet.

Here is our clerestory ceiling.  Doesn't it look nice!  Our new remodel will be as bright and airy as our new construction.
 

Here is our new fireplace all installed.  This area will be a really nice place to relax and read a book, or to browse through a magazine.

This next image shows the wall to the new book store, and the wall to the hallway.  This corner will house part of the General Collection that is now being stored in the Community Room.

This photo shows the doorway to the new public restroom area.  These are located about where the old ones were.  To the left, you can see the hallway to the new construction area, and what used to be our back door to the library.

This is not a great photo! I was trying to show you the new books store.  This will be the entryway, and inside is a nice space for the book store.

This is a view inside the book store.  The construction crew are using it for their office right now.  The doorway you can see peeping out on the right will lead to a storage space.

This last image is the new remodel as you'd see it if you were able to walk through the construction wall behind the public computers in the entryway.  This is where our old back door used to be.  You can see how nice and bright our new library is going to be!

Wednesday, July 14, 2010

Work Continues on the Old Side of the Building

While we're enjoying our new building, the work progresses on the old section.  They are in the process gutting the interior, and putting up new supports and wall segments.

This first photo shows the length of the old building.  We're looking from the old staff area through the former General Collections (Adult) area to the east windows.

Its not everyday that you see a construction vehicle in the middle of a library! This one is helping to install the new support beams for the clerestory ceiling which will run down the old hallway.  You can see a gaping hole where the former front doorway was.

Outside, two of our wonderful construction crew go by, discussing the work.

We're in the old General Collections section looking south.  You can see where the new support beams are going up.

We're looking up into the new construction area.  In the background, you can see the outside walls of the atrium.  The new clerestory roof will be the same height as the atrium roof.

This final picture looks like it was taken outside, but we're still in the old section of the building. I couldn't get any closer because of the construction work going on, but I wanted to show you where the new Library Foundation Bookstore is going to be.  You can see the wall supports are now installed, and it will take up most of the space that used to be the Young Adult area.