Our construction crew has moved outside again, this time to the parking lot between the new addition and the Seminary Building. The blacktop has been removed in preparation for a new drainage system. Additionally, they'll be putting in a small island. This will mark the flow of traffic for the drive-up window.
Here are a few pictures to show the activity:





No comments:
Post a Comment